Client:United Utilities
Flow Rate:150m³/hr

Background

Wetheral Waste Water Treatment Works were required to achieve a solids compliance before they were able to discharge safely. The site had a combination of gravity and pumped flows from various locations, which were directed to the top of the site for treatment.

The Overall Objective

The site required a suitable solution that could successfully reduce the effluent suspended solids within the challenging environment to be below 40mg/L.

The solids were irregular in size and the existing settlement tanks were unable to achieve the desired results effectively, which if continued would lead to breaching the consent set out by the Environment Agency.

Solution

SPS initially took a number of samples of the irregular effluent for testing to ensure they could achieve the consent required.

As a result a D100 DAF was proposed and subsequently installed onsite.

Back to top
Great Night @MadeInWales Awards this evening. @Siltbuster Winners of the Manufacturing Innovation Award. https://t.co/UMuW9Ldy9D
9:47 PM 3 Oct 2019 Join the conversation
Blue skies today in Monmouth. Here's some of the fleet in the yard enjoying the nice weather. The kit is ready for… https://t.co/dgTZqDa3ew
10:16 AM 20 Sep 2019 Join the conversation
Richard. D. Coulton, talks to @Buildingtalk about the top causes of water pollution on construction sites, the impa… https://t.co/Oiyjmm75vY
10:23 AM 3 Sep 2019 Join the conversation
Siltbuster are helping Gothenburg construct a new metro while protecting the environment @SmartRailWorldhttps://t.co/BRjm2kr4dz
11:18 AM 25 Jul 2019 Join the conversation