Workdry International Group Websites

Upper Heyford Sewage Treatment Works

Client:Xylem Water Solutions for Thames Water
Flow Rate:9l/s

Background

Thames Water were in the process of refurbishing the Sewage Treatment Works at Upper Heyford Sewage Treatment Works which was to be undertaken by Xylem Water Solutions. During the refurbishment they needed temporary treatment facilities to ensure discharge consents were maintained.

 

The Overall Objective

The works had a consent standard for 50% during the refurbishment and required a temporary replacement for primary settlement and biological treatment.

Solution

Siltbuster Process Solutions provided full support during the process and as a result installed a HB40R Clarifier as the primary tank, MBBR30 for biological treatment plus a D25 DAF for final solids preparation.

The plant was onsite for 3 months and it is estimated that using the temporary solution instead of tankering offsite reduced costs by 50 – 60%.

Back to top
Our first 1 day practical pollution awareness course will be at Cadbury World, Birmingham on the 27th March. Book y… https://t.co/xhiwfisNEd
1:30 PM 8 Feb 2019 Join the conversation
SPS are proud to be working with Alpheus Environmental to provide additional water treatment capacity to an industr… https://t.co/A8dLU5FNZt
8:29 AM 5 Feb 2019 Join the conversation
We will be presenting at the free Geotex Liverpool ground engineering seminar on the 20th Feb. Register now to find… https://t.co/GTUJcOPDC1
1:18 PM 1 Feb 2019 Join the conversation
Siltbuster will be exhibiting again at this year's Concrete Show, March 20-21 at the NEC. Come and chat to us on st… https://t.co/yrEWqByaN8
11:32 AM 28 Jan 2019 Join the conversation
Booking is open for our 2019 programme of Managing Water Pollution on Construction Sites training courses! Find ful… https://t.co/g0nZ8PQ5AA
10:19 AM 28 Jan 2019 Join the conversation