Northwich Waste Water Treatment Works

Client:United Utilities
Flow Rate:125m³/hr

Background

Northwich Waste Water Treatment Works had difficulty achieving their solids compliance of below 45mg/l and required a temporary solution to prevent non compliance’s in future. During periods of dry weather the site struggled with solids compliance which were averaging 40mg/l but could peak at 82mg/l.

The crude sewage was highly alkaline which added to the solids being slow settling in nature.

The Overall Objective

The overall objective was to reduce the Total Suspended Solids content however United Utilities also wanted to reduce the Phosphorus and Iron concentrations with chemical dosing, due to an upcoming Phosphorus limit being introduced.

Solution

SPS supplied and installed a D100 DAF with and integral sludge pump and walkways to ensure United Utilities were achieving their discharge consent.

 

Back to top
An Ecoclear unit is just being loading destined for Sweden. A true masterpiece of innovation and engineering, the… https://t.co/gnbUPMjLKG
2:42 PM 2 Apr 2020 Join the conversation
Our engineering, workshop, stores, fleet services and yard teams are extremely busy preparing equipment for immedia… https://t.co/v7zCBClXZk
2:11 PM 2 Apr 2020 Join the conversation
#Siltbuster installation completed & fully operational on a wind farm construction site in Dunbar, Scotland. MT30,… https://t.co/cTfKeZcvRt
2:07 PM 2 Apr 2020 Join the conversation
Being a support and solutions provider to numerous Essential Services across the UK, our amazing team is providing… https://t.co/2zAS7SltPZ
11:42 AM 1 Apr 2020 Join the conversation
A #Siltbuster CM400 OWS is heading for a remediation site in Sweden with historical hydrocarbon pollution. This Oil… https://t.co/0Xfp5uEUnj
1:47 PM 26 Mar 2020 Join the conversation