Llanfaglan Waste Water Treatment Works

Client:Welsh Water
Flow Rate:108m³/h

Background

Llanfaglan Waste Water Treatment Works serves the North West Wales Region. The works needed to take their final settlement tank offline for a period of over 5 weeks in order to carry out maintenance work.

The Overall Objective

During the time maintenance work the Settlement Tank would need to be drained and a suitable alternative would be required to take its place and enable the site to stay online and ensure they remained compliant with discharge consents.

The site required a solution able to cope with flows of over 100m³/h whilst also dealing with very slow settling solids.

Solution

Siltbuster Process Solutions proposed a treatment system that would enable Llanfaglan to remain online continue to achieve their consent limits. The system consisted of 4 HB50E Clarifiers, 4 sludge pumps with auto timers plus interconnecting pipework for the inlet, outlet and sludge, with 2 walkways for easy access.

Back to top
Great Night @MadeInWales Awards this evening. @Siltbuster Winners of the Manufacturing Innovation Award. https://t.co/UMuW9Ldy9D
9:47 PM 3 Oct 2019 Join the conversation
Blue skies today in Monmouth. Here's some of the fleet in the yard enjoying the nice weather. The kit is ready for… https://t.co/dgTZqDa3ew
10:16 AM 20 Sep 2019 Join the conversation
Richard. D. Coulton, talks to @Buildingtalk about the top causes of water pollution on construction sites, the impa… https://t.co/Oiyjmm75vY
10:23 AM 3 Sep 2019 Join the conversation
Siltbuster are helping Gothenburg construct a new metro while protecting the environment @SmartRailWorldhttps://t.co/BRjm2kr4dz
11:18 AM 25 Jul 2019 Join the conversation