Farndon Waste Water Treatment Works

Client:Imtech Process
Flow Rate:75m³/hr

Background

Farndon Waste Water Treatment Works were at risk of failing the treated water discharge consent limit for Total Suspended solids and Total Phosphorus. Tertiary treatment was required at short notice, within 2 weeks, to ensure there was more headroom for the treated water.

The Overall Objective

The existing Tertiary site was not achieving the desired results which led to Farndon requiring a solution that would effectively lower the Total Suspended Solids and Total Phosphorus in the treated water.

Farndon also required a short term treatment system to enable them to design a long term permanent solution.

Solution

As a result SPS proposed a DAF tertiary treatment system proven from previous work with Southern Water and provided a DAF D50 to treat up to 75m³/hr.

Back to top
Gritbuster on the box! Filming for CBeebies "Do You Know?" took place yesterday at a large road sweeper depot in Te… https://t.co/c3ARSny7tE
8:28 AM 9 Apr 2019 Join the conversation
Whoever you are, wherever you are, water is your human right. 2.1 billion people live without safe water at home. T… https://t.co/ZdtHVcK9JK
9:53 AM 22 Mar 2019 Join the conversation
Siltbuster are in Stockholm to exhibit at 'Renare Mark' (Cleaner Ground) with our long time partner Clean Water Eng… https://t.co/lqtNKKu2Lu
2:28 PM 20 Mar 2019 Join the conversation
Equipment is only part of the Solution when it comes to complying with Environmental Legislation. Discover what els… https://t.co/Z628ffEeiO
8:58 AM 19 Mar 2019 Join the conversation
Siltbuster are supporting #RedNoseDay with a cake sale and competition at our Monmouth HQ to raise money to support… https://t.co/Nih1hUbsSR
10:01 AM 15 Mar 2019 Join the conversation