Background

Farndon Waste Water Treatment Works were at risk of failing the treated water discharge consent limit for Total Suspended solids and Total Phosphorus. Tertiary treatment was required at short notice, within 2 weeks, to ensure there was more headroom for the treated water.

The Overall Objective

The existing Tertiary site was not achieving the desired results which led to Farndon requiring a solution that would effectively lower the Total Suspended Solids and Total Phosphorus in the treated water.

Farndon also required a short term treatment system to enable them to design a long term permanent solution.

Solution

As a result SPS proposed a DAF tertiary treatment system proven from previous work with Southern Water and provided a DAF D50 to treat up to 75m³/hr.

Back to top
Yet another EcoClear unit, co-developed with our strategic partner Aquajet Systems AB in Sweden, is heading for the… https://t.co/gABq9cdezj
11:02 AM 7 Feb 2020 Join the conversation
It is great to see our HB Lamella Clarifiers ready for installation by PR Power as part of the treatment process of… https://t.co/CM6tzznaxE
9:24 AM 7 Feb 2020 Join the conversation
Enjoy the views of our modular treatment solution at Porlock WRC, to be used during the upgrade of the site’s exist… https://t.co/ky0aTR9qvG
9:12 AM 7 Feb 2020 Join the conversation
A further 4 of our industry leading HB50E's are on their way to Clean Water Engineering in Sweden. Destined for con… https://t.co/12ORCJPf7k
3:48 PM 29 Jan 2020 Join the conversation
We are very proud to confirm that our industry leading water treatment solutions and products, expertly deployed by… https://t.co/Uxv7vU430I
1:36 PM 23 Jan 2020 Join the conversation