Farndon Waste Water Treatment Works

Client:Imtech Process
Flow Rate:75m³/hr

Background

Farndon Waste Water Treatment Works were at risk of failing the treated water discharge consent limit for Total Suspended solids and Total Phosphorus. Tertiary treatment was required at short notice, within 2 weeks, to ensure there was more headroom for the treated water.

The Overall Objective

The existing Tertiary site was not achieving the desired results which led to Farndon requiring a solution that would effectively lower the Total Suspended Solids and Total Phosphorus in the treated water.

Farndon also required a short term treatment system to enable them to design a long term permanent solution.

Solution

As a result SPS proposed a DAF tertiary treatment system proven from previous work with Southern Water and provided a DAF D50 to treat up to 75m³/hr.

Back to top
Great Night @MadeInWales Awards this evening. @Siltbuster Winners of the Manufacturing Innovation Award. https://t.co/UMuW9Ldy9D
9:47 PM 3 Oct 2019 Join the conversation
Blue skies today in Monmouth. Here's some of the fleet in the yard enjoying the nice weather. The kit is ready for… https://t.co/dgTZqDa3ew
10:16 AM 20 Sep 2019 Join the conversation
Richard. D. Coulton, talks to @Buildingtalk about the top causes of water pollution on construction sites, the impa… https://t.co/Oiyjmm75vY
10:23 AM 3 Sep 2019 Join the conversation
Siltbuster are helping Gothenburg construct a new metro while protecting the environment @SmartRailWorldhttps://t.co/BRjm2kr4dz
11:18 AM 25 Jul 2019 Join the conversation