Farndon Waste Water Treatment Works

Client:Imtech Process
Flow Rate:75m³/hr

Background

Farndon Waste Water Treatment Works were at risk of failing the treated water discharge consent limit for Total Suspended solids and Total Phosphorus. Tertiary treatment was required at short notice, within 2 weeks, to ensure there was more headroom for the treated water.

The Overall Objective

The existing Tertiary site was not achieving the desired results which led to Farndon requiring a solution that would effectively lower the Total Suspended Solids and Total Phosphorus in the treated water.

Farndon also required a short term treatment system to enable them to design a long term permanent solution.

Solution

As a result SPS proposed a DAF tertiary treatment system proven from previous work with Southern Water and provided a DAF D50 to treat up to 75m³/hr.

Back to top
Siltbuster are helping Gothenburg construct a new metro while protecting the environment @SmartRailWorldhttps://t.co/BRjm2kr4dz
11:18 AM 25 Jul 2019 Join the conversation
If you're at #EWWMconference in Birmingham today or tomorrow, drop by our Siltbuster Process Solutions stand to dis… https://t.co/MKIdXPh7vp
10:34 AM 16 Jul 2019 Join the conversation
Looking forward to the award night on Thursday! https://t.co/X4gMQNyzOX
7:25 AM 10 Jul 2019 Join the conversation
SPS have a feature in Food Processing Magazine where Rich Matthews discusses how companies are using compact treatm… https://t.co/QveYldVlzV
8:31 AM 2 Jul 2019 Join the conversation
See this and more at outdoor stand DA1 https://t.co/GunKIXwcMe
8:57 AM 7 Jun 2019 Join the conversation