Farndon Waste Water Treatment Works

Client:Imtech Process
Flow Rate:75m³/hr

Background

Farndon Waste Water Treatment Works were at risk of failing the treated water discharge consent limit for Total Suspended solids and Total Phosphorus. Tertiary treatment was required at short notice, within 2 weeks, to ensure there was more headroom for the treated water.

The Overall Objective

The existing Tertiary site was not achieving the desired results which led to Farndon requiring a solution that would effectively lower the Total Suspended Solids and Total Phosphorus in the treated water.

Farndon also required a short term treatment system to enable them to design a long term permanent solution.

Solution

As a result SPS proposed a DAF tertiary treatment system proven from previous work with Southern Water and provided a DAF D50 to treat up to 75m³/hr.

Back to top
Our first 1 day practical pollution awareness course will be at Cadbury World, Birmingham on the 27th March. Book y… https://t.co/xhiwfisNEd
1:30 PM 8 Feb 2019 Join the conversation
SPS are proud to be working with Alpheus Environmental to provide additional water treatment capacity to an industr… https://t.co/A8dLU5FNZt
8:29 AM 5 Feb 2019 Join the conversation
We will be presenting at the free Geotex Liverpool ground engineering seminar on the 20th Feb. Register now to find… https://t.co/GTUJcOPDC1
1:18 PM 1 Feb 2019 Join the conversation
Siltbuster will be exhibiting again at this year's Concrete Show, March 20-21 at the NEC. Come and chat to us on st… https://t.co/yrEWqByaN8
11:32 AM 28 Jan 2019 Join the conversation
Booking is open for our 2019 programme of Managing Water Pollution on Construction Sites training courses! Find ful… https://t.co/g0nZ8PQ5AA
10:19 AM 28 Jan 2019 Join the conversation