Workdry International Group Websites

Compton Bassett Sewage Treatment Works

Client:Wessex Water
Flow:30m3/hr

Background

The Compton Bassett plant in Wiltshire treats domestic sewage from the nearby town as well as periodically taking waste from a nearby domestic waste recycling centre with onsite waste washing and cleaning facilities. This waste can have a high concentration of ammonia and during periods of peak discharge the process of de-nitrification causes excess sludge to rise, which then floats on the surface of the Primary settlement tanks.

 

The Overall Objective

The floating sludge can block the plant’s downstream processes, therefore its removal is vital to maintaining an efficient operation and ensuring suspended solids consent limits are met.

 

Solution

To solve the problem, SPS installed its mobile D25 Dissolved Air Flotation (DAF) unit between the inlet screen and primary settlement tanks, enabling it to treat an average flow of 30 cubic metres of water per hour.

Mike Neal, Wessex Water’s site project engineer, comments: “By using SPS’s DAF unit to remove the floating sludge, we were able to reduce the load on the biological treatment plant so it could work more efficiently and effectively.  Importantly, the process has enabled us to mitigate any potential risk of breaching our strict discharge consent standards.”

Phil Bates, Siltbuster Process Solution’s Municipal Sales Manager, comments: “By hiring one of our modular, mobile DAF units, Wessex Water was able to quickly and easily deploy our system without needing to make a capital investment decision.  Thanks to our technical experts’ consultative approach, we have worked with Wessex Water’s team to successfully manage what was fast becoming a potentially serious issue at the Compton Bassett site, meaning it could continue to operate at optimum levels.”

Back to top
An Ecoclear unit is just being loading destined for Sweden. A true masterpiece of innovation and engineering, the… https://t.co/gnbUPMjLKG
2:42 PM 2 Apr 2020 Join the conversation
Our engineering, workshop, stores, fleet services and yard teams are extremely busy preparing equipment for immedia… https://t.co/v7zCBClXZk
2:11 PM 2 Apr 2020 Join the conversation
#Siltbuster installation completed & fully operational on a wind farm construction site in Dunbar, Scotland. MT30,… https://t.co/cTfKeZcvRt
2:07 PM 2 Apr 2020 Join the conversation
Being a support and solutions provider to numerous Essential Services across the UK, our amazing team is providing… https://t.co/2zAS7SltPZ
11:42 AM 1 Apr 2020 Join the conversation
A #Siltbuster CM400 OWS is heading for a remediation site in Sweden with historical hydrocarbon pollution. This Oil… https://t.co/0Xfp5uEUnj
1:47 PM 26 Mar 2020 Join the conversation