Workdry International Group Websites

Tata Steel Treatment Plant Replacement

Background Tata Steel in Shotton produces pre-finished steel, primarily for the domestic appliance and construction industry, and generates some 45,000m3 per annum of metals laden effluent, primarily dissolved Zinc. However with the effluent plant built in 1976 and having been designed to cater for a time when the site was an integrated steel plant, the … Continued

Tata Steel Dissolved Metals Removal

Background The client was part-way through construction work required to accommodate a new production facility in one of its existing buildings. The method of construction required a series of well points to be installed around the periphery of sheet piles so as to lower the water table and prevent the base of the excavation from … Continued

Global Minerals Minewater Treatment

Background Canadian Mining Company, Global Minerals Ltd., first contacted SPS in August 2011 on the advice of world leading mining consultants SRK. This was to discuss the possibility of using SPS’s experience in mine water treatment to fast track the construction of a plant to remove dissolved heavy metals from up to 100m3/hr of water … Continued

Getrag Oil Water Separation

Background Getrag is the world’s largest supplier of transmission systems for passenger cars and commercial vehicles. They experienced a problem where the production effluent had become contaminated and could not be treated by the site’s own effluent treatment plant. The effluent was therefore being contained and transported off site for treatment. The Overall Objective The … Continued

Suez Dissolved Metals Removal

Background Suez’ client, NLMK required additional capacity to treat pickling liquor at its production site in La Louviere, Belgium, which produces various grades of hot and cold rolled steel coils. NLMK Group is a leading international manufacturer of high-quality steel products with a vertically integrated business model. Mining and steelmaking are concentrated in cost-efficient regions; … Continued

Back to top
The product of 2 years worth of research and development between market leaders within their respective fields, the… https://t.co/pCfwxPZi4D
4:38 PM 19 Nov 2018 Join the conversation
The Siltbuster CPD training courses are coming to Chelsea Football Stadium on 21st Nov. Book online now… https://t.co/VaWZjH8KhL
1:40 PM 2 Nov 2018 Join the conversation
Our next Managing Water Pollution on Construction Sites CPD training course is coming to Liverpool on the 31st Oct.… https://t.co/s4tnaRgSVZ
7:59 AM 16 Oct 2018 Join the conversation
We were pleased to raise money for @macmillancancer by holding a coffee morning last week. The cakes from Claire an… https://t.co/AT1KWGtjT3
8:42 AM 8 Oct 2018 Join the conversation
Our open day is underway! https://t.co/khoNExHdSh
2:32 PM 5 Oct 2018 Join the conversation