Wetheral Waste Water Treatment Works

Client:United Utilities
Flow Rate:150m³/hr

Background

Wetheral Waste Water Treatment Works were required to achieve a solids compliance before they were able to discharge safely. The site had a combination of gravity and pumped flows from various locations, which were directed to the top of the site for treatment.

The Overall Objective

The site required a suitable solution that could successfully reduce the effluent suspended solids within the challenging environment to be below 40mg/L.

The solids were irregular in size and the existing settlement tanks were unable to achieve the desired results effectively, which if continued would lead to breaching the consent set out by the Environment Agency.

Solution

SPS initially took a number of samples of the irregular effluent for testing to ensure they could achieve the consent required.

As a result a D100 DAF was proposed and subsequently installed onsite.

Back to top
Whoever you are, wherever you are, water is your human right. 2.1 billion people live without safe water at home. T… https://t.co/ZdtHVcK9JK
9:53 AM 22 Mar 2019 Join the conversation
Siltbuster are in Stockholm to exhibit at 'Renare Mark' (Cleaner Ground) with our long time partner Clean Water Eng… https://t.co/lqtNKKu2Lu
2:28 PM 20 Mar 2019 Join the conversation
Equipment is only part of the Solution when it comes to complying with Environmental Legislation. Discover what els… https://t.co/Z628ffEeiO
8:58 AM 19 Mar 2019 Join the conversation
Siltbuster are supporting #RedNoseDay with a cake sale and competition at our Monmouth HQ to raise money to support… https://t.co/Nih1hUbsSR
10:01 AM 15 Mar 2019 Join the conversation
Following our success in winning the Construction News Specialists Award 2018, Siltbuster have been shortlisted for… https://t.co/OFnUIsslcr
2:55 PM 13 Mar 2019 Join the conversation