Upper Heyford Sewage Treatment Works

Client:Xylem Water Solutions for Thames Water
Flow Rate:9l/s

Background

Thames Water were in the process of refurbishing the Sewage Treatment Works at Upper Heyford Sewage Treatment Works which was to be undertaken by Xylem Water Solutions. During the refurbishment they needed temporary treatment facilities to ensure discharge consents were maintained.

 

The Overall Objective

The works had a consent standard for 50% during the refurbishment and required a temporary replacement for primary settlement and biological treatment.

Solution

Siltbuster Process Solutions provided full support during the process and as a result installed a HB40R Clarifier as the primary tank, MBBR30 for biological treatment plus a D25 DAF for final solids preparation.

The plant was onsite for 3 months and it is estimated that using the temporary solution instead of tankering offsite reduced costs by 50 – 60%.

Back to top
Some Siltbusters looking good in the sun! These two lorries are heading for a large infrastructure project in Somer… https://t.co/BmZzh1wz6g
1:36 PM 19 Apr 2018 Join the conversation
SPS and Suez cooperate to deliver clean water for Italian fertilizer manufacturer under highly variable conditions… https://t.co/WtqxqjrdAJ
3:52 PM 17 Apr 2018 Join the conversation
Glad to be part of the event and looking forward to some interesting conversations. https://t.co/OZFOOrExk0
12:02 PM 11 Apr 2018 Join the conversation
Great feedback from our recent win. https://t.co/zb7TtkObao https://t.co/0rhjSppOfZ
1:24 PM 27 Mar 2018 Join the conversation