Upper Heyford Sewage Treatment Works

Client:Xylem Water Solutions for Thames Water
Flow Rate:9l/s

Background

Thames Water were in the process of refurbishing the Sewage Treatment Works at Upper Heyford Sewage Treatment Works which was to be undertaken by Xylem Water Solutions. During the refurbishment they needed temporary treatment facilities to ensure discharge consents were maintained.

 

The Overall Objective

The works had a consent standard for 50% during the refurbishment and required a temporary replacement for primary settlement and biological treatment.

Solution

Siltbuster Process Solutions provided full support during the process and as a result installed a HB40R Clarifier as the primary tank, MBBR30 for biological treatment plus a D25 DAF for final solids preparation.

The plant was onsite for 3 months and it is estimated that using the temporary solution instead of tankering offsite reduced costs by 50 – 60%.

Back to top
Equipment is only part of the Solution when it comes to complying with Environmental Legislation. Discover what els… https://t.co/Z628ffEeiO
8:58 AM 19 Mar 2019 Join the conversation
Siltbuster are supporting #RedNoseDay with a cake sale and competition at our Monmouth HQ to raise money to support… https://t.co/Nih1hUbsSR
10:01 AM 15 Mar 2019 Join the conversation
Following our success in winning the Construction News Specialists Award 2018, Siltbuster have been shortlisted for… https://t.co/OFnUIsslcr
2:55 PM 13 Mar 2019 Join the conversation
Our first 1 day practical pollution awareness course will be at Cadbury World, Birmingham on the 27th March. Book y… https://t.co/xhiwfisNEd
1:30 PM 8 Feb 2019 Join the conversation
SPS are proud to be working with Alpheus Environmental to provide additional water treatment capacity to an industr… https://t.co/A8dLU5FNZt
8:29 AM 5 Feb 2019 Join the conversation