Upper Heyford Sewage Treatment Works

Client:Xylem Water Solutions for Thames Water
Flow Rate:9l/s

Background

Thames Water were in the process of refurbishing the Sewage Treatment Works at Upper Heyford Sewage Treatment Works which was to be undertaken by Xylem Water Solutions. During the refurbishment they needed temporary treatment facilities to ensure discharge consents were maintained.

 

The Overall Objective

The works had a consent standard for 50% during the refurbishment and required a temporary replacement for primary settlement and biological treatment.

Solution

Siltbuster Process Solutions provided full support during the process and as a result installed a HB40R Clarifier as the primary tank, MBBR30 for biological treatment plus a D25 DAF for final solids preparation.

The plant was onsite for 3 months and it is estimated that using the temporary solution instead of tankering offsite reduced costs by 50 – 60%.

Back to top
SPS will be at next month's Food and Drink show in Coventry with Dave Gaskill speaking. Register to attend for free… https://t.co/RV0NNaHCxv
9:46 AM 17 Sep 2018 Join the conversation
Our 1 day Managing Water Pollution on Construction Sites CPD training course is coming to the Welsh capital on the… https://t.co/1I1q4iZyL7
1:06 PM 10 Sep 2018 Join the conversation
Siltbuster can help advise. For more information read our post: https://t.co/uF1rKwwCs7 https://t.co/GGR01lLw0T
11:19 AM 4 Sep 2018 Join the conversation
We're excited for this weekend's raft race on the beautiful river Wye. This year we're entering a joint team with o… https://t.co/mv4ti6tmr4
11:58 AM 31 Aug 2018 Join the conversation
What does the Environment Agency’s RPS mean for construction companies? Read our feature in Developer Update: https://t.co/OfBar5LX8r
12:24 PM 24 Aug 2018 Join the conversation