Background

Farndon Waste Water Treatment Works were at risk of failing the treated water discharge consent limit for Total Suspended solids and Total Phosphorus. Tertiary treatment was required at short notice, within 2 weeks, to ensure there was more headroom for the treated water.

The Overall Objective

The existing Tertiary site was not achieving the desired results which led to Farndon requiring a solution that would effectively lower the Total Suspended Solids and Total Phosphorus in the treated water.

Farndon also required a short term treatment system to enable them to design a long term permanent solution.

Solution

As a result SPS proposed a DAF tertiary treatment system proven from previous work with Southern Water and provided a DAF D50 to treat up to 75m³/hr.

Back to top
Some Siltbusters looking good in the sun! These two lorries are heading for a large infrastructure project in Somer… https://t.co/BmZzh1wz6g
1:36 PM 19 Apr 2018 Join the conversation
SPS and Suez cooperate to deliver clean water for Italian fertilizer manufacturer under highly variable conditions… https://t.co/WtqxqjrdAJ
3:52 PM 17 Apr 2018 Join the conversation
Glad to be part of the event and looking forward to some interesting conversations. https://t.co/OZFOOrExk0
12:02 PM 11 Apr 2018 Join the conversation
Great feedback from our recent win. https://t.co/zb7TtkObao https://t.co/0rhjSppOfZ
1:24 PM 27 Mar 2018 Join the conversation